Castle Storage Route 18 Needham

Project Overview
This project is one of many that KEG has worked with Castle Storage of Braintree, MA. The Castle Storage portfolio consists of self-contained, multistory, climate controlled state of the art storage facilities in the South Shore and Boston.

Castle Storage Main Street Weymouth is a three story 100,000 sf state of the art storage facility located on an approximately 10 acre site which was constructed in two phases.

KEG led all aspects of the site design and permitting for the project. KEG provided topographic and property line surveys; performed due diligence/ planning level studies; provided civil/site design including site layout, grading, and utilities; coordinated transportation and wetlands; prepared all permit applications; coordinated with the Town representatives; and represented the project through the public hearing process.

The project involved local permitting made more complex by the existence of a local jurisdiction vernal pool. State permits a Mass DOT access permitting process. Local permits include permits through the Conservation Commission and Planning Board.

KEG used Low Impact Development principles by incorporating bio swales, rain gardens and subsurface stormwater recharge systems to facilitate groundwater infiltration and limit project runoff.